Huawei installations can require a cloud/API route or local intervention, depending on the project and the supported equipment. Choose the procedure for the actual inverter, logger, firmware, and network architecture.
A SmartLogger can aggregate several inverters and provide a local route as well as a route through the manufacturer platform.
After connection, validate inverter power, energy totals, status, device grouping, and timestamps in SmartgridX Monitoring. Do not assume that access to the manufacturer portal automatically provides the credentials or permissions required by an API integration.