SMA data may be delivered through a supported API, FTP/push flow, or another project-specific connection route. Start with the integration guide that corresponds to the configured source; each route has its own credentials, refresh behaviour, and commissioning checks.
The data manager can form the bridge between the plant devices, the supported transfer route and SmartgridX.
Confirm the installation identity and time zone, then compare current power and cumulative energy with the SMA platform. For file-based data, also review upload frequency, file continuity, and duplicate or missing intervals.