Check the Pro380 terminal labels
Follow the manufacturer wiring diagram for the exact Pro380 revision. Connect RS485 A/+ to controller A, RS485 B/- to controller B, and the communication reference to GND when available. Verify the labels on the installed meter before energising the bus.