In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| EVTEC ECP 4.x / sospesocharge | Measurements and prepared power/current control | Measurements checked; charging and pause/resume not yet tested with a vehicle |
See integration details for connection requirements and operating limitations.
An implemented integration provides charger measurements and power/current control for the ECP 4.x interface. DC vehicle SOC can be used where supplied by the charger. There is also an updated variant with watchdog handling, paced writes and scheduler-only requests.
Measurements and driver loading have been checked, but the automated control test had no vehicle available to accept charging. Charge, pause/resume and any bidirectional capability therefore still need physical validation; protocol fields for bidirectional charging are not proof that a particular charger/vehicle supports it.