In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| go-e chargers with phase switching | Automatic single-/three-phase switching | Matching charger, vehicle and scheduler build required |
See integration details for connection requirements and operating limitations.
| Device Type | Modbus TCP (Ethernet) | RS485 |
|---|---|---|
| Go-e EV charger | ✅ | ❌ |
In the go-e application, go to your device, then "Settings".
Go in the "Connection" tab.
Automatic switching between single-phase and three-phase charging is available in a dedicated controller build. The charger, vehicle and installation must support phase switching, and the installed build must include the scheduler support.