| Device Type | Variants | Modbus TCP (Ethernet) | RS485 |
|---|
| MaxiCharger DC Compact | 40 kW | ✅ | ✅ |
| MaxiCharger DC Fast | 40–240 kW |
| MaxiCharger AC Ultra | 2 × 22 kW | ❌ |
For correct Ethernet wiring, follow the guidelines for Ethernet wiring.
InfoRS485 Wiring
- For correct RS485 wiring: follow the RS485 wiring guidelines.
- If the wiring shown in the table below is incorrect, please let us know.
- There is no general industry consensus on the use of A and B for RS485 polarity, so the naming may be counterintuitive for some devices.
After the electrical installation of a charger is complete, follow these steps to configure communication with the Sofar EMS.
- On the charging station’s touchscreen, go to the Home screen.
- Double-tap the upper-left corner of the screen.
- Tap Device Maintenance.
- Enter the password — the last six digits of the serial number found on the product label.
- Tap Set Parameters.
- Wait for the system to load data.
- Configure communication settings as follows:
- OCPP IP: IP of the Sofar EMS (e.g.
192.168.1.100)
- OCPP PORT:
502
- MGR IP / URL / PORT: Optional management platform details
- Running environment: Select correct region (EU, UK, USA, etc.)
- Modbus Slave Address: Unique ID (1–247)
- Baud Rate:
9600
- Parity:
None
- Data Bits:
8
- Stop Bits:
1
- Tap Save. The system will restart with the new settings.
- Wait for about 1–2 minutes until boot completes.
- On the Home screen, check the Internet connection icon:
- ✅ Connected — icon shows a network link
- ❌ Disconnected — icon shows “x”; check cables or settings
- Switch on the power to the charger.
- The charger will launch the setup wizard.
- Follow the on-screen steps:
- Select the language.
- Connect via Wi‑Fi, Ethernet, or Cellular.
- Set time zone.
- Set maximum input current to match grid capacity.
- On the Standby Screen, tap the currency ($) icon (bottom-left corner).
- The Cost Details screen will open.
- Double-tap the top-left corner to enter the maintenance menu.
- Tap Device Maintenance.
- Enter the last six digits of the charger’s serial number.
- Tap Set Parameters.
- Fill in the following fields:
| Setting | Description | Example |
|---|
| OCPP IP | IP address of the Sofar EMS | 192.168.1.100 |
| OCPP PORT | Modbus port number | 502 |
| MGR IP/URL/PORT | Optional backend connection details | – |
| Running Environment | Corresponding operating region | Europe |
- Tap Save to confirm and restart the device.
- Once restarted, confirm the connection icon shows active network status.
Last updated August 26, 2026