In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| APsystems APstorage ELT-12 | Battery monitoring and prepared external-power requests | Reads/writes observed; charge/discharge response pending |
See integration details for connection requirements and operating limitations.
| Device Type | Modbus TCP (Ethernet) | RS485 | Curtailment | Reactive power control |
|---|---|---|---|---|
| APstorage | ✅ | ✅ | ❌ | — |
| ECU | ⚠️ |
Make sure that the Controller and the APstorage are connected to the same network. For correct ethernet wiring, follow the guidelines for ethernet wiring.
For RS485 wiring, follow the guidelines for RS485 wiring.
A custom integration provides battery-system monitoring and a prepared external-power command path. Monitoring and accepted register writes have been observed, but actual charge/discharge response was not established while the device was OFF. Control therefore remains pending physical validation.