In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| Kaco blueplanet 92.0 TL3 | Monitoring, production limiting and release | Six-minute physical test completed; firmware 03.59-03aaf518; 105 kW excluded |
See integration details for connection requirements and operating limitations.
| Device Type | Variants | Modbus TCP (Ethernet) | RS485 | Curtailment | Reactive power control |
|---|---|---|---|---|---|
| blueplanet TL3 | 50.0 / 60.0 | ✅ | ❌ | ✅ | — |
| 87.0 / 92.0 / 105.0 | 🔶 (specific software required) |
Curtailment of the blueplanet TL3 87.0 / 92.0 / 105.0 inverters is only possible with software version V03-59-REL-03aaf518 or newer. You can check the software version of the inverter under the "info" tab.
The Sofar EMS and the Kaco inverters communicate via Ethernet.
For correct ethernet wiring: Follow the the guidelines for ethernet wiring.
Modbus Write access must be enabled in the settings of the inverter:
Modbus Write access must be enabled in the settings of the inverter:
A custom integration for the verified blueplanet 92.0 TL3 register map and firmware 03.59-03aaf518 provides monitoring and production limiting/release. A six-minute physical limiting/release test was completed. PV total follows AC production rather than MPPT DC input. This evidence does not establish compatibility for the 105 kW model.