In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| Deye three-phase hybrids | Temperature, power, command-timing and full-battery handling updates | Select the update for the actual model/firmware |
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| Deye SUN-12K-LP3 | Custom command timing and temperature correction | Control has run on hardware; daylight PV-limiting test pending |
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| Deye SUN-50K-SG01HP3-EU-BM4 | Distribute total power across two battery inputs | Offline validated; physical charge/discharge/release test required |
See integration details for connection requirements and operating limitations.
| Device Type | Variants | Modbus TCP (Ethernet) | RS485 | Curtailment | Reactive power control |
|---|---|---|---|---|---|
| Single Phase LV Hybrid Inverters (SG0XLP1-EU) | SUN-3/3.6/5/6/7/7.6/8/10/12K | ❌ | ✅ | ❌ | — |
| Three Phase LV Hybrid Inverters (SG0XLP3-EU) | SUN-3/4/5/6/8/10/12/14/15/16/18/20K | ||||
| Three Phase HV Hybrid Inverters (SG0XHP3-EU) | SUN-5/6/8/10/12/15/20/25/29.9/30/35/40/50/60/70/75/80K | ||||
| Single Phase String Inverters (G0XP1-EU) | SUN-1/1.5/2/2.2/2.5/2.7/3/3.3/3.6/4/4.2/4.6/5/5.2/6/6.2/7/7.5/8/9/10/10.5K | ||||
| Three Phase String Inverters (G0XP3-EU) | SUN-3/4/5/6/7/8/9/10/12/15/18/20/22/23/25/30/35/36/40/45/50/60/70/75/80/90/100/120/125/130/135/136K |
| Device | Sofar EMS model OM1 | Sofar EMS model IG8 | RS485-USB converter | RS485-Ethernet converter |
|---|---|---|---|---|
| Pin 1 / Modbus-485_B | RS485 A | RS485_POS | RS485 A | TX+ |
| Pin 2 / Modbus-485_A | RS485 B | RS485_NEG | RS485 B | TX- |
| Pin 3 / GND_485 | RS GND | GND | Not available | G |
Go to “Main Screen” >> “System Settings” >> “Advanced Function.”
Three-phase improvements correct the battery-temperature offset, coordinate command timing, calculate total AC power from the phases to avoid wraparound, and correctly report full-power requests. Another change avoids sending a charge request to a full battery that would unnecessarily restrict PV.
A custom variant uses multiple-register writes, writes unchanged control values less often and renews them periodically. It also corrects the battery-temperature offset. The custom control path has run on a SUN-12K-LP3; daylight PV-limiting validation was still open after the change.
An offline-validated custom variant distributes the total request across two battery inputs, addressing a configuration where applying the same total request per input doubled the resulting power. The device must have the matching two-input configuration. Physical charge/discharge and release validation remains necessary before enabling it.