In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| Swatten SiH-5kW-TH | Modbus RTU monitoring and prepared external-control mapping | Remote-control firmware and physical commissioning required for each variant |
| Swatten SiH-6kW-TH | Modbus RTU monitoring and prepared external-control mapping | Remote-control firmware and physical commissioning required for each variant |
| Swatten SiH-15kW-TH / SiH15KTH | Modbus RTU monitoring and prepared external-control mapping | Remote-control firmware and physical commissioning required for each variant |
| Swatten SiH50KTH | Modbus RTU monitoring and prepared external-control mapping | Remote-control firmware and physical commissioning required for each variant |
See integration details for connection requirements and operating limitations.
A custom implementation covers the SiH-5kW-TH, SiH-6kW-TH, SiH-15kW-TH / SiH15KTH and SiH50KTH mappings over Modbus RTU. It includes inverter, PV, BMS SOC and battery measurements.
External control depends on manufacturer-specific remote-control registers in addition to the V1.03 measurement protocol. Firmware enabling that interface and physical commissioning are required; the model mapping is not evidence that every variant has been field-tested.