In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| FoxESS G-Max | Zero battery-power request on release | Requires the matching control update |
See integration details for connection requirements and operating limitations.
| Device Type | Modbus TCP (Ethernet) | RS485 | Reactive power control |
|---|---|---|---|
| G-MAX | ✅ | ❌ | — |
| G-MAX Plus | |||
| T-MAX | |||
| G-MAX EMU | ✅ |
Make sure that the battery and the Sofar EMS are connected to the same network /subnetwork.
Releasing smart-grid control writes a zero battery-power request so the previous external setpoint is not retained.