In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
Model / system
Beta addition
Validation and conditions
Growatt MOD 3-10KTL3-XH via ShineMaster-X
VPP 2.02 monitoring
Zero/discharge observed; charge test failed, external control remains disabled
See integration details for connection requirements and operating limitations.
A custom VPP 2.02 implementation provides monitoring. Zero-power and discharge behaviour have been observed; the charge test failed. External control remains disabled until commissioning resolves the charging path, so do not treat this as fully validated bidirectional control.