In beta and available on request. The additions in this overview require the matching integration or controller update and are not confirmed as part of the standard customer release. Request them through your existing Eniris support conversation. The status applies to these additions, not to every existing function of the devices listed elsewhere on this page.
| Model / system | Beta addition | Validation and conditions |
|---|---|---|
| Growatt SPH | Raise unusable 1% requests to effective 2% minimum | Account for the minimum controllable step |
See integration details for connection requirements and operating limitations.
Not all batteries are compatible with Growatt’s control systems. Before installation, confirm that your specific battery model is on the official Growatt compatibility list and that the inverter firmware supports the battery's communication requirements.
| Device Type | Manual | Modbus TCP (Ethernet) | RS485 | Curtailment | Reactive power control |
|---|---|---|---|---|---|
| SPH 3000-6000TL BL-UP | Manual | ❌ | ✅ | ✅ | — |
| SPH 4000-10000TL3 BH-UP | Manual |
| Device | Sofar EMS model OM1 | Sofar EMS model IG8 | RS485-USB converter | RS485-Ethernet converter |
|---|---|---|---|---|
| RS485 A | RS485 A | RS485_POS | RS485 A | TX+ |
| RS485 B | RS485 B | RS485_NEG | RS485 B | TX- |
| GND | RS GND | GND | Not available | G |
Remote power requests at 1% can be raised to the inverter's effective 2% minimum rather than being sent as an unusable request. This changes the minimum controllable step and must be included when assessing low-power operation.